Plan ahead. It wasn’t raining when Noah built the ark.

PROJECT EXPERIENCE

33s Spray

Location:

Spray Lake, Alberta


Client:

AltaLink LP


Reference Contact Details:

As Requested


Time Period of Involvement:

2013 – Present


Project Description:

  1. Expand the existing substation fenced area towards south by 25M.
  2. Install a new control room for spray substation. Replace the existing protection and control schemes with new standards in the new control room.
  3. Provide SCADA and Telecom schemes from the new devices in the new control room.
  4. Replace the existing PT set 33S-PTI with new set of magnetic PT’s.


Current Status of Project:

In Progress


Voltage:

138kV